Dominion Atlantic Railway Bear River Bridge
24 March 2012 9:39am ADT
The demolition contractor has arrived at the Bear River railway bridge.
On the utility barge, two men are in the cherry picker
ready to go to work on the span to be removed next.
Time is short – high tide will arrive in four hours.
|
W3C HTML Validation Service http://validator.w3.org/ |
W3C CSS Validation Service http://jigsaw.w3.org/css-validator/ |