Dominion Atlantic Railway Bear River Bridge
22 March 2012 12:12pm ADT
Another view of the big A-frame showing how it is installed on the
contractor's barge, complete with heavy concrete counterweights.
The time is about one hour before high tide.
|
W3C HTML Validation Service http://validator.w3.org/ |
W3C CSS Validation Service http://jigsaw.w3.org/css-validator/ |