Dominion Atlantic Railway Bear River Bridge
09 January 2012 2:42pm
It is now about three hours past high tide. With the two front spud legs
holding the barge in position against the downstream current produced by
the falling tide, the long reach excavator picks up the top hammer drill.
The photographer's shadow is visible on the raised rear spud leg.
|
W3C HTML Validation Service http://validator.w3.org/ |
W3C CSS Validation Service http://jigsaw.w3.org/css-validator/ |