Dominion Atlantic Railway Bear River Bridge 17 December 2011 12:49pm
There is a strong upstream current (from left to right in this view) caused by the
rising tide. A top hammer drill mounted on a long reach excavator begins
drilling a hole in the sea bottom, in preparation for underwater blasting.
|
W3C HTML Validation Service http://validator.w3.org/ |
W3C CSS Validation Service http://jigsaw.w3.org/css-validator/ |